Concrete Floor Prep For Vinyl Plank Flooring
Vinyl plank flooring is water resistant and if it has a wpc core it s waterproof so it won t be damaged by the off gassing.
Concrete floor prep for vinyl plank flooring. Prep your subfloor so that it s clean dry and level within 3 16 inch change per 10 feet. It can be constructed from wood plywood plastic or concrete. And this time it went so much smoother. If a floor plank and underlayment or adhesive will not fit under the door remove the door and trim it with a circular saw about 1 8 inch above the level of the new flooring.
Tape a 3 foot square piece of scrap vinyl to the concrete with duct tape sealing the edges tight. Don t sand vinyl flooring as it may contain asbestos. Leave the vinyl in place for 72 hours. However laying vinyl flooring over concrete requires a bit more preparation.
If a floor plank and underlayment or adhesive will not fit under the door casing cut the casing with a backsaw about 1 16 inch above the level of the new flooring. If your concrete subfloor was just poured you ll need to allow it to properly cure for a minimum of 60 days before your luxury vinyl flooring installation begins. A subfloor is the bottom layer of any floor. Vinyl planks are a great option if you want durable flooring but don t have a ton of installation experience.
Preparing a concrete subfloor for luxury vinyl flooring concrete is a common subfloor material and in general it s easy to prepare for a luxury vinyl flooring installation project. This is the second time we ve done our concrete basement using vinyl plank flooring see the last place here. I did this whole room by myself completely in two evenings and about half an hour the next day and feel confident that these tips and tools will help you if you want to do the same. Before installing your vinyl flooring whether the subfloor of your work area is hardwood or concrete one crucial step is to make sure the subfloor is level and clean.
Self leveler is available in powder and pre mixed form and is used to create a flat smooth surface in flooring projects. Test the floor for moisture. Newly poured concrete off gases water vapor and typically needs from 120 to 150 days to dry out before it s ready to accept flooring according to milliken company. Preparing the floor for installation of any flooring is the key to a great job especially when installing vinyl planks.