Concrete Wall Expansion Joint Spacing
It is best to cut joints as early as possible either while finishing with a concrete groover or within 6 18 hours after finishing with a concrete saw.
Concrete wall expansion joint spacing. Expansion joints should be located at intervals up to 90 feet. There is a special check to be done at the construction joints when larger retaining walls or structures having very high lateral loads are designed. Plan out your control joint spacing 24 36 times the depth of your concrete slab. Author spacing lewerenz 1907 75 ft 23 m for walls.
Joints are most effective when the aspect ratio of the slab is kept to 1 1 for example 5m x 5m if the slab is a narrower than it is long it is possible to increase this to a maximum aspect ratio of 1 5 for example 2m x 3m don t leave the placing of concrete expansion joints to chance and enlist the services of a structural engineer if. The friction of the concrete is the key factor that limits the movement. Joints are commonly spaced at distances equal to 24 to 30 times the slab thickness. Hunter 1953 80 ft 25 m for walls and insulated roofs 30 to 40 ft 9 to 12 m for.
Joint spacing in meters. Joint spacing that is greater than 15 feet require the use of load transfer devices dowels or diamond plates. Aci 224r 92 one to three times the height of the wall in solid walls. For example locating control joints at the ends of lintels may compromise arching action.
2 wall height spacing 8 feet or less 3 times wall height. Concrete joints are normally used to prevent cracks when the concrete shrinks by creating forming tooling sawing and placing joint formers. Consideration must also be given to the effect of control joint placement on load distribution within the wall. Concrete joints are used to compensate when concrete expands or shrinks with changes in temperature.
Joint spacing in feet contraction joints may be tooled into the concrete surface at the time of placement. Table 1 2 expansion joint spacings. Greased steel dowels are often cast horizontally into the wall to tie adjacent sections together. Vertical expansion joints are incorporated into the wall to account for expansion due to temperature changes.
Use projecting strips to reduce wall thickness by at least one fourth ref. The hight shear force is applied at the horizontal construction joints located at the lower level. Recommended spacing of vertical contraction joints modified from ref. The pre planned cracks will provide a better finish concrete product and will be formed in specific locations where those cracks could be monitored.
Control joints are not intended to stop cracking but rather control cracking. Joints in poured walls by kim basham and bruce suprenant effective methods for controlling unsightly wall cracking f i g u r e 1.